How Long Does It Take to Build a Pool in Kissimmee?

4 min read  ·  Hallmark Pool & Spa World  ·  Kissimmee

The short answer

How long it takes to build a pool depends on the type of pool, the design, permits, weather, inspections and the features you add. A fiberglass pool typically goes in within 2-4 weeks once the yard is ready. For a custom concrete pool, the timing depends on your design, so ask about it when you request a quote.

How Long Does It Take to Build a Pool in Kissimmee?

One of the first questions people ask is how long it takes to build a pool. It depends on the pool. A custom concrete pool is built step by step in your yard, and its schedule depends on the design and on things outside anyone's control, like weather and inspections. A fiberglass pool arrives finished, so the install moves faster once the site is ready. This guide explains the phases of a pool build in Kissimmee and what affects each one.

How Long It Takes to Build a Pool in Kissimmee

There is no single number that fits every project. Two pools in the same neighborhood can take different amounts of time because of their size, their features and what happens with permits and weather along the way.

For a fiberglass pool, once the yard is ready, the pool typically goes in within 2-4 weeks.

For a custom gunite pool, ask about timing when you request a quote. Timing worked out for your design, your yard and the features you choose is more useful than a general estimate.

The Steps Before Construction Starts

Some of the time on any pool project happens before the first shovel goes in the ground.

  • Design. Every Hallmark custom pool starts as a 3D model. You can see the shape and features and make changes before construction. The faster you settle on the design, the sooner the next steps can start.
  • Permits. A pool needs building permits. Hallmark handles the permits and makes sure the work meets local, state and federal regulations. Permit timing depends on the local building department.
  • HOA approval. If your home is in a community with a homeowners association, check your HOA's rules. Most require approval before you build, and that review takes its own time.

The Four Phases of a Custom Pool Build

Hallmark builds custom pools in four phases with 16 steps in all. The company's own crew handles every stage.

  1. Layout and excavation. The crew marks the outline, digs the hole, sets the steel (a grid of rebar on 12-inch centers that strengthens the concrete) and puts in the first plumbing.
  2. The pool shell. The shell is made of gunite, which is concrete sprayed into place with air pressure and shaped by hand. Then the crew backfills soil around the shell, pregrades the ground and runs the rough plumbing. The plumbing is pressure tested to check for leaks.
  3. Tile, coping and deck. Waterline tile goes on, footers go in if the pool will have a screen enclosure, and then the coping (the cap along the pool's top edge) and the deck are installed.
  4. Systems, finish and startup. Electricians wire the lighting, automation and equipment. The screen enclosure and safety features go in. Then the plaster interior is applied and the water is balanced with startup chemistry. Final grading and cleanup finish the job.

Some steps have to wait for the one before them. The plumbing has to pass its pressure test before it is covered, for example, and the footers for a screen enclosure need to be in place before the coping and deck. That order is part of why a build takes the time it does.

What Affects the Timeline

Several things can make a pool project shorter or longer:

  • Design and size. A larger pool, or one with a complex shape, involves more digging, more steel and more hand-shaping.
  • Features. Waterfalls, bubblers, deck jets, LED lighting, tanning ledges, spas and swim-up bars each add work, and some add plumbing and electrical steps.
  • Permits. Construction cannot start until the permits are issued.
  • Inspections. Permitted work is inspected along the way, and the next step waits until the inspection is done.
  • Weather. Heavy rain can pause outdoor work such as digging and spraying gunite.
  • Screen enclosure. Adding an enclosure adds footers in phase 3 and the enclosure itself in phase 4.
  • Decisions during the build. Changing the design after construction starts can add time. Settling the details in the 3D model first helps avoid that.

How Long a Fiberglass Pool Takes to Install

A fiberglass pool is made in a factory. The shell arrives at your home with its surface already finished and is set into the ground in one piece. That removes the on-site shell work, which is a large part of a concrete build.

Once the yard is ready, a fiberglass pool typically goes in within 2-4 weeks. Hallmark is an authorized Latham dealer and can offer all 70 Latham fiberglass pool shapes, across 17 collections. You can compare them on the fiberglass pools page.

Planning Around Kissimmee Weather

Kissimmee's warm climate means a long swimming season, and many families use their pool most of the year. The same climate brings frequent afternoon storms in summer. Hurricane season runs from June 1 through November 30.

Rain affects some steps more than others. Digging and shell work happen outdoors in open ground, so a stretch of wet weather can push them back. Your builder plans around this, and it is one more reason timing is specific to each project.

To keep your project moving, make your design choices early, decide up front on features and a screen enclosure, and start any HOA review as soon as you can. You can learn more about the custom build on the custom pools page.

The easiest way to get a timeline for your own yard is a free, no-obligation quote. Call Hallmark at (407) 847-4622 or request a free pool quote, and ask about timing for your design.

Frequently Asked Questions

How long does it take to build an inground pool?

It depends on the type of pool, the design, permits, weather, inspections and features. A fiberglass pool typically goes in within 2-4 weeks once the yard is ready, and timing for a custom pool depends on the design, so ask about it when you request a quote.

How long does a fiberglass pool take to install?

Once the yard is ready, a fiberglass pool typically goes in within 2-4 weeks. The shell arrives finished and is set in one piece.

Does rain delay pool construction?

It can. Heavy rain can pause outdoor steps such as digging and spraying gunite, which is one reason timing differs from project to project.

Do I need a permit to build a pool in Kissimmee?

Yes, a pool needs building permits. Hallmark handles the permits and makes sure the work meets local, state and federal regulations.

Get a Free Quote

Tell us about your yard and what you have in mind, and we'll put together a free, no-obligation quote.

Get a Free Quote

Tell us what you're planning, whether it's a new pool, a remodel, a hot tub or a swim spa, and we'll put together a free quote.