
Phase 1
Layout and Excavation
-
Layout
We mark the exact pool shape, elevations, and utility-safe boundaries.
-
Dig
Excavation begins and we shape the pool to the engineered dimensions.
-
Steel
Rebar is installed on 12 inch centers and tied to reinforce the full structure.
-
Pre Plumbing
Main drain suction, return, and feature lines are set before shell application.


